indra

ARC support Indra on the Haramain High Speed Rail project by providing Installation & Integration Services to support their scope of work. ARC provided the following works to Indra:-

• Installation of the GSM-R Equipment, access control and Security Equipment in the BTS Shelters (14 x Shelters)

• Installation of Telecoms, Access Control and Security Equipment in Maintenance Facility

• Installation of Telecoms, Access Control and Security Equipment in Energy Sub-Station Buildings (9 x Energy Buildings)

• Created Installation Designs/Drawings from Indra Concept Drawings

• Supply of all Installation Materials This project utilised the expert Project Management, Engineering Resources, along with our installation team to deliver the project to the Indra’s satisfaction.